Please note that these calculations are based on U.S. measurements and roofing practices, and may not be sufficient or applicable for use outside of North America.

ASSEMBLED SCREWS & PLATES
(2 men: 1 placing ASAPs/1 fastening)


× 8.2 sec. per fastener*
per 2-man crew
divided by 3600 sec. per hour
= 0.00
Hours to Install

× 2 men times
0.00 Hours
= $ 0.00
Total Labor Cost

× # of Fasteners
divided by 1000
= $ 0.00
Total Material Cost
  $ 0.00
TOTAL COST

ACCUTRAC SYSTEM (1 man using AccuTrac tool)

1000
Total # of Fasteners
× 5.5 sec. per fastener* per 1-man crew divided by 3600 sec. per hour = 0.00
Hours to Install
0.00
Hourly Labor Rate
× 0.00 Hours = $ 0.00
Total Labor Cost

×

# of Fasteners divided by 1000

= $ 0.00
Total Material Cost
  $ 0.00
TOTAL COST

YOUR SAVINGS!

0.00 HOURS SAVED
$ 0.00 LABOR & MATERIAL COST SAVED